Hydrogen Fuel News
← Back to article
Verification report

Green Hydrogen Infrastructure: RWE’s Lingen Plant Sends First Renewable Hydrogen to Marl Chemical Park

Core facts are accurate: two 100 MW PEM electrolysers at RWE’s Lingen site are producing renewable hydrogen, which has begun flowing via ~120 km of pipeline to Evonik’s Marl Chemical Park as part of GET H2 Nukleus, with major IPCEI funding and plans to reach 300 MW by 2027. Some technical and numerical details (stack brand, pressures, CO₂ per tonne, certain contracts) are not confirmed in public sources and should be qualified or trimmed.

Subscribe to keep reading.

This article was checked against 17 factual claims. Subscribers see every claim, its verified status, our notes, and the sources we matched against.

Sign up now for free

Get the H2 Markets Brief

what 120,000+ hydrogen industry pros read every Monday.

Get the H2 Markets Brief

what 120,000+ hydrogen industry pros read every Monday.