Hydrogen Peaker Plant: Owen Sound’s Ambitious Bid for North America’s First Fully Hydrogen-Powered Facility

Hydrogen Peaker Plant: Owen Sound’s Ambitious Bid for North America’s First Fully Hydrogen-Powered Facility

September 25, 2025 0 By Erin Kilgore

After weeks of back-and-forth presentations and lively public meetings, Owen Sound City Council gave a unanimous thumbs-up to a game-changing proposal. Sitting in the municipal chambers with Georgian Bay stretching out below, councillors signed off on Public Energy Inc.’s plan to build what could be North America’s first fully hydrogen-powered peaker plant, right next door to Hydrogen Optimized’s electrolyzer manufacturing hub.

Perched on Georgian Bay in Grey County, Owen Sound has long been a hardworking port and industrial hotspot. Now, it’s shifting gears towards clean tech and advanced manufacturing. Embracing a Hydrogen Peaker Plant feels like a no-brainer—it slots right into the city’s economic diversification playbook and syncs up with Ontario’s push to cut carbon footprints.

Could hydrogen handle Ontario’s peak power needs?

Here’s the gist: when grid demand dips in the wee hours, surplus electricity gets channeled into RuggedCell™ unipolar alkaline electrolyzers built by Hydrogen Optimized. They split water into oxygen—which gets vented safely—and hydrogen, which heads straight into high-pressure tanks for Green Hydrogen Storage. Then, when the mercury soars in summer or plunges in winter and everyone flips on their air conditioners or heaters, that stored hydrogen fires up specially designed turbines that can crank out megawatts within minutes—leaving nothing but water vapor in the exhaust.

But we’re not just talking theory here. Hydrogen peaker plants are still few and far between worldwide, and North America hasn’t seen one at scale yet. Ontario IESO, the province’s grid manager, has thrown out feelers for hydrogen as a grid stabilizer—opening capacity calls that now welcome hydrogen-based bids. And you’re not alone: Kincardine and Loyalist Township have also staked their claims, turning hydrogen into one of clean energy’s hottest new frontiers in Ontario.

Who’s driving the vision?

  • Public Energy Inc.: A Toronto-based independent power producer that’s made its name in on-site generation, battery storage, and now hydrogen. They’re licensed by the Ontario Energy Board to both generate and retail power.
  • Hydrogen Optimized: Owen Sound’s own electrolyzer pioneer since 2021, with about 100 team members building RuggedCell™ systems and kicking off a local hydrogen cluster.
  • Owen Sound City Council: Gave their stamp of approval to get Ontario IESO eligibility—without handing over city land or opening the treasury, showing they’re keeping the books—and the public—transparent.
  • Ontario IESO: The folks who keep Ontario’s lights on, vetting capacity bids to make sure the system stays rock-solid.
  • Georgian College: With federal cash in hand to launch an Industry 5.0 innovation hub, they’re busy training the next gen of clean-tech pros.

The upside for Owen Sound and Ontario

  • Grid Resilience: On-demand peak capacity that kicks in fast and pulls zero carbon emissions on-site.
  • Economic Boost: Project backers say around 400 construction gigs and 20 permanent roles could pop up—though no one’s independently fact-checked those numbers yet.
  • Homegrown Expertise: Giving a lift to Owen Sound’s local hydrogen sector, with spillover perks for researchers and service firms.
  • Decarbonization: Helping Ontario hit its climate goals by phasing out or backing up fossil-fuel peaker plants.
  • Community Engagement: From town halls to regular project updates, they’re making sure residents stay in the loop.

Navigating risks and hurdles

Let’s be real: no trailblazing project comes without its hurdles. Hydrogen is notoriously flammable, so safety protocols have to be airtight—leaks can happen, and hydrogen’s teeny molecules can sneak through even tiny gaps. There’s also the risk of metal embrittlement in pipelines that weren’t built for hydrogen. Plus, a few big hydrogen schemes in North America have hit delays or been shelved due to technical headaches and ballooning costs—British Columbia’s recent stumble is a cautionary tale.

What they’re saying

“This endorsement really highlights Owen Sound’s lead in the clean energy revolution,” says Mayor Ian Boddy. “We’re all about smart growth that sparks local jobs and keeps our waterfront pristine.”

“Our RuggedCell™ electrolyzer is designed for industrial-scale muscle,” adds Hydrogen Optimized CEO Sarah Mitchell. “Marrying it with Public Energy’s peaker setup could rewrite the rulebook for zero-emission backup power.”

An Ontario IESO spokesperson noted, “We welcome innovative capacity bids that shore up grid reliability and move the needle on provincial climate targets. Hydrogen looks like a key piece of the puzzle.”

Beyond the bay: a blueprint for clean power?

If Ontario IESO gives the green light to Owen Sound’s bid, it’ll be a milestone: North America’s first full-fledged Hydrogen Peaker Plant—subject to independent confirmation, of course. Backers hope to break ground in 2028 and flip the switch by year-end, though those dates are still on paper. Nail it here, and we could see a domino effect across Canada and the U.S., ironing out rules, safety standards, and market models for hydrogen storage and power generation. As Ontario inches toward its net-zero ambitions, projects like this one are the proving grounds. For Owen Sound and beyond, the next chapter will show if hydrogen can truly deliver on its promise of reliable, low-carbon peak power.

Spread the love